Sport and Leisure centre fit-outs
Partridge Interiors Ltd, Warwickshire
Partridge Interiors Ltd, Warwickshire
We received and enquiry from LLTSC to install a new suspended ceilings in three of their high-quality squash courts. The work was to be carried out in courts 3 and 4, and their newly built court 5.
Due to the nature of the courts being at international competition quality, the suspended ceiling needed to be installed and a height of 5.6 meters from the floor. Extra care was taken to protect the specialised flooring whilst the work was undertaken. Hardboards were laid to prevent any damage from the mobile scaffold towers which were required to install the suspended ceilings, and the footfall of workers and movement of building materials.
We carried out the electrical work for the lighting in two stages. Firstly, we installed the suspended ceiling grid ready for the electrical 1st fix, then when this was completed, we returned to install the ceiling tiles. As the courts were to be subjected to high impact from squash balls, we clipped all the perimeter tiles into the grid to prevent any possibility of them being dislodged when hit.
We completed the two new squash courts and six months later we were asked to return to replace the existing suspended ceilings and lighting in squash courts 1 and 2. On the usual pre-work inspection we suspected the possibility of asbestos, which was confirmed by laboratory testing and the existing suspended ceilings were removed by a licensed asbestos contractor.
Once the Asbestos was removed and the air quality tests were complete, we were able to carry out the installation of the new suspended ceilings and lighting. We carried this out with the same approach as before by protecting the squash court floors and building mobile scaffold towers to access the height of the suspended ceiling.
We installed Zentia 24mm white grid system with a 600mm x 600mm TVS Vinyl faced tile. TVS Vinyl Ceiling Tiles are a vinyl-faced gypsum ceiling tile designed for use within a lay-in grid system to form a demountable suspended ceiling. They have a stippled vinyl face which is wipeable, a foil backing, and taped edges to the tile. They are ideal for use in a range of commercial and residential ceiling applications especially when high moisture resistance or light reflectance are required.
Board Performance Specifications.
In an exciting development of JD Sports distribution centre, we were asked to install glass partitions with aluminium frames, and doors over three floors forming new office spaces. The system used was a 77mm aluminium framed system with double glazed modules with 6.4mm laminated glass. This offered an attractive and functional partition system with high fire integrity and acoustic performance. The system can be fitted with integral blinds available in a full range of RAL and BS options to create the chosen ambiance or in corporate colours.
Partridge Interiors Ltd have carried out a number of works for the Volvo Group, always to a high standard and reasonable price showing flexibility when required in a fast moving, live business environment. I would highly recommend them.
“Partridge Interiors provided a cost effective and professional service for our new call centre refurbishment. The quotation was provided promptly and the requirements understood. The team on site were professional and kept within timescales and budget. Happy to recommend.”
Partridge Interiors supported us to re-develop our office space at a very short notice. The work was carried out to a high standard. Pricing was competitive and communication was clear and concise.
I just wanted to drop you a line to say thank you for the work you carried out at our new premises. Having to deal with different contractors during the build may I just say how refreshing it was to deal with a company that just turn up, carry out the work as requested with minimum fuss then clean up after themselves before leaving. It all sounds so simple but seems to happen less and less these days as there always seems to be a reason to turn up late or not finish on time. Our dealings with Partridge Interiors Ltd have been as straight forward and second to none.
Warwick Energy Ltd recently needed to relocate their office location. Partridge Interiors were selected to install the internal office partitioning that involved sound insulation panelling, double-glazed venetian blind window partition for our board room and also the creation of a small kitchen area involving some discrete plumbing. We followed Jason’s suggestions and recommendations and they far exceeded our expectations.
Throughout the installation Jason Partridge and his friendly team worked quickly and professionally with an on-time completion to our entire satisfaction. I cannot praise his work highly enough and wholeheartedly recommend him and his company for office partitioning installation. You will not be disappointed.
“Firstly thanks for the recent installation/extension works carried out in our Heat Treatment department of Ricardo MTC, Leamington Spa. Despite the high hazard business process your team worked correctly and safely to our safe systems of works and policies. The overall works completed was speedy and to schedule which is what Ricardo needed for further contractors to follow.
The final level of workmanship was great and to the job specification and that I couldn’t have personally ask for more. Will work with Partridge Interiors again Im sure”